Switch

Switching is the easy part.

Three steps, no dark period, no hostage data.

The plan

Three steps. That's the whole thing.

01

Export

Pull your data out of your current POS. Any export format works.

02

We migrate

Products, customers, and loyalty balances — mapped, loaded, and verified against your counts. Yes, even from the big green one.

03

Run parallel

Both systems live side by side until you cut over on your own schedule.

The guarantee: if we can't beat your current bill, don't switch.

FAQ

The five questions everyone asks.

How long does a migration take?

Most single stores are live within a week of handing us an export.

Do we lose our METRC history?

No. METRC is the system of record — Ironclad syncs items, packages, and patients straight from it.

Can we keep selling during the switch?

Yes. You run parallel and cut over when you're ready, not when we are.

Is there a long contract?

No long lock-in. If the product doesn't keep you, a contract shouldn't.

What about our hardware?

Ironclad runs on standard receipt printers, drawers, scales, and scanners — bring what you own.

Next step

Bring your export. Leave with a plan.